Your statement is pretty confusing. You might want to rephrase by saying:
Cycle Length pf XX Weeks
-------------------------
Test 250 Weeks XX-XX
EQ (dosage) Weeks XX-XX
Then follow up asking what scenario of weeks you should run your EQ.
Yea?
Quote:
Originally Posted by swldg
As I stated in the intro page, I've done several cycles, but none too serious and only with sust. Have some test 250 and eq, was thinking of hitting the test up front then in the middle start the EQ and run that for 10-12 weeks after I'm off test. I don't want to blow up too large (already 220) cause I do not want to draw any attention at my job. Does this sound like a good plan as far as a small cycle?
Thanks bros
|